Table 12.1 Summary Table for Site
Activities, Potential Environmental Impacts and Recommended Mitigation Measures
in the Coming Months
Contract No. |
Major
Site Activities |
Location/
Working Period |
Potential
Environmental Impact |
Recommended
Mitigation Measures |
ND/2019/01 |
(a)
Excavation
/ Backfilling |
Portion
1c, 6a, 7, 8a, 9b |
- Construction Dust impact - Noise Impact (Construction Phase) - Water Quality Impact (Construction Phase) - Waste Management (Construction Waste) |
Air -
Watering
on exposed earth and haul road. -
Cover the
stockpiles or dusty materials. -
Deploy
water bowsers to water the haul road. -
Deploy
mist-cannon on site -
Provide
shelter with top and 3-sides for cement production activities. -
Cover the
Arsenic-containing soil. -
Store the
bulk cement in enclosed silo tank for soil treatment. -
Close the
mechanical cover of the vehicles used for transporting dusty materials. -
Establish
vehicle wheel washing facilities at vehicle exit points. -
Speed
control of site vehicles. Noise -
Regular
inspect of construction plants in good condition. -
Provide
temporary noise screens if necessary. -
Use of
Quiet plants (QPME) and working methods if possible. -
Sequencing
operation of construction plants where practicable. -
Shut down
the machines and plant if not in use. -
Only
well-maintained plant to be operated on-site -
Mobile
plant to be sited as far away from NSRs as possible practicable. -
Conduct
noise monitoring regularly. -
Erect
silent-up noise barrier at portion 6b.
Water -
Set up
wastewater treatment system (AquaSed) on site -
Erect
soil bund / temporary drain to divert /collect surface runoff. -
Maintain
the drainage and wastewater treatment facilities. Waste
/ Chemical Management -
Sort out
demolition debris and excavated materials from demolition works to recover
reusable / recyclable portions -
Provide
recycling bins on site, encourage reuse and recycle as much as possible. -
Provide
drip trays for chemical containers. -
Chemical
spill kit available on site. -
Chemical
waste cabinet available on site. -
Chemical
wastes to be stored in appropriate containers and collected by a licensed
chemical waste collector. -
Delivery
of yard waste to tree shredding facility for upcycling. |
(b)
Site formation |
Portion 1c, 2, 5 |
|||
(c)
Planting / Metal works /
RC structure works / E&M works |
Portion 8a |
|||
(d)
Construction
of subway |
Portion 2 |
|||
(e)
Sewage Works |
Portion 1c, 7 |
|||
(f)
RC Construction of fresh
water service reservoir |
Portion 8a |
|||
(g)
District Cooling System |
Portion 6a, 9b |
|||
(h)
Operation
of HAC treatment facility / HAC soil treatment |
Portion 3, 6b |
|||
(i)
Drainage
works / watermains works |
Portion 1a, 1c, 2, 5, 6a, 7, 8a, 8b, 9b,
10b, 11b |
|||
(j)
Road works |
Portion 1c, 2, 6a, 7, 8a,
9b |
|||
(k)
Soil nail / Slope works |
Portion 1a, 2, 6a, 8a |
|||
(l)
Grouting, ground treatment |
Portion 8b |
|||
(m) Road lighting works |
Portion 6a |
|||
(n)
Sheet
piling/ ELS |
Portion 1a, 1c, 8b, 9b |
|||
(o)
Stockpile of soil |
Portion 13 |
|||
ND/2019/02 |
(a)
Pipe
Jacking |
Portions
2, 4 |
Air, Noise, Waste |
-
Dusty works should be spray
water. Idle stockpile or slop should be covered by Tarpaulin sheet properly. -
Wheel washing should be carried out at every
exit. -
Plants should be well maintained to prevent
dark smoke and oil leakage. Idle plant should be turned off. -
Drip tray should be provided for all
chemical and stationary plants. -
No construction works shall be carried out
in restricted hours (7:00 pm to 7:00 am) unless CNP is obtained. -
Erect noise screen along site boundary. -
Waste should be sorted and dispose according
to the Waste Management Plan -
No direct discharge of wastewater into storm
drains is allowed. Wastewater must be de-silted before discharged in
accordance with the water discharge license. -
Dull green barrier and ecological measures
should be implemented according to the Ecological protection plan. |
(b)
Backfilling |
Portions
4 |
Air, Noise, Waste |
||
(c)
Concreting |
Portions
3, 11 |
Air, Noise, Water, Waste, Ecology |
||
(d)
Bedding
& Pipe Laying |
Portion
5, 6 |
Air, Noise, Water, Waste, Ecology |
||
(e)
ELS |
Portions
4, 5, 6 |
Air, Noise, Water, Waste, Ecology |
||
(f)
Grouting |
Portion
6, 11 |
Air, Noise, Water |
||
(g)
Cut and
Fill of Slope |
Portion
5, 6 |
Air, Noise, Water, Waste |
||
(h)
Sheet pile installation |
Portion
5 |
Air, Noise, Water, Waste |
||
ND/2019/03 |
N/A |
N/A |
N/A |
N/A |
ND/2019/04 |
(a)
Rebar Fixing, formwork
erection and scaffolding erection |
Bridge
F, A1, A2, A3, Portion J, K, H, A, B |
- Air, Noise, Waste |
-
Dusty
works should be sprayed with water or stockpile should be covered by
tarpaulin properly. -
Plants
should have maintenance to prevent dark smoke and oil leakage. Idle plant
should be turned off. -
Drip tray
should be provided for all chemical and stationary plants. -
No
construction works shall be carried out in restricted hours (7:00 pm to 7:00
am) unless CNP is granted. -
Waste
should be sorted and disposed according to Waste Management Plan. -
No direct
discharge of wastewater into storm water drains is allowed. Wastewater must
be desilted before discharging according to water discharge license. |
(b)
Concreting |
Portion F, B, N, K |
- Air, Noise, Waste |
||
(c)
Grouting |
Bridge F, A1, A2, A3 and Portion J, K, H |
- Air, Noise, Water, Waste |
||
(d)
Back filling |
Bridge
A1, Portion F |
- Air, Noise, Waste |
||
(e)
Excavation
& ELS |
Portion A, B, J, H, K |
- Air, Noise, Waste |
||
(f)
Road
works |
Portion A, B, H,
K |
- Air, Noise, Waste |
||
(g)
MIC |
Portion
J |
- Air, Noise, Waste |
||
(h)
Sheet piling |
NIL |
- NIL |
||
(i)
UU
diversion |
Portion
J and K |
- Air, Noise, Waste |
||
ND/2019/05 |
(a)
ELS &
Pile Cap Construction |
NB69 Bay 2~8 NB110 Bay 6~7 |
- Construction Dust Impact - Noise Impact - Water Quality Impact (Construction Phase) - Waste Management (Construction Waste) - Landscape and Visual - Cultural Heritage |
Regular
watering on exposed worksites and haul road. -
Stockpiling
area should be provided with covers and water spraying system. -
Only well maintained plant to be operated on site. -
plant
known to emit noise strongly in one direction, where possible, be orientated
so that the noise is directed away from nearby NSRs. -
mobile
plant to be sited as far away from NSRs as possible practicable. -
All open
stockpiles of construction materials of more than 50m3 to be cove red with
tarpaulin. -
Manholes
to be adequately covered and temporarily sealed so as to
prevent silt, construction materials or debris being washed into the drainage
system. -
All
vehicles and plant to be cleaned before leaving a construction site to ensure
no earth, mud, debris and the like is deposited by them on roads. -
Segregate
and store different types of waste in different containers, skip or
stockpiles to enhance reuse or recycling of materials and their proper
disposal. -
Sort out
demolition debris and ex cavated materials from demolition works to recover
reusable/recyclable portions. -
Provide
training to workers on appropriate waste management procedures, including
waste reduction, reuse and recycling. -
To adopt
other good site practice, such as arrangements for collection and effective
disposal to an appropriate facility, of all wastes generated at the site and
regular cleaning and maintenance programme for drainage. -
Chemical
wastes to be stored in appropriate containers and collected by a licensed
chemical waste Contractor. Chemical wastes (e.g. spent lubricant oil) should
be recycled at an appropriate facility as far as possible, while the chemical
waste that ca nnot be recycled should be disposed of at either the Chemical
Waste Treatment Centre, or another licensed facility, in accordance with the
Waste Disposal (Chemical Waste) (General) Regulation. -
Conducting
Construction Vibration Monitoring -
Tree
Protection & Preservation Exiting trees to be retained within the Project
Site should be carefully protected during construction. In
particular OVTs will be preserved according to ETWB Technical Circular
(Works) No. 29/2004. -
Tree
Transplantation Trees unavoidably affected by the Project works should be
transplanted where practical. Trees should be transplanted straight to their
final receptor site and not held in a temporary nursery as far as possible. -
Erect 2m
high dull green site boundary fence. |
(b)
Cap Construction |
E3-04a,
E3-04b, E4-01 and E4-02 |
|||
(c)
Cross
head construction |
B2-01, B2-02 and B2-03 |
|||
(d)
Pier / Pier head Construction |
D2-01 and E305M |
|||
(e)
Fabrication
for segment |
C2, C1, D1, D2, E1, E4 |
|||
(f)
Form
Traveler |
E3-01 construction 3rd to 6th
pair E2-02 construction 14th pair &
dismantling of FT1 D2-02 construction 6th to 8th
pair D2-03 construction 2nd pair to 4th
pair E2-01 erection of 5th set of form
traveler. |
|||
(g)
Segment Erection by Launching Girder & Crane |
Bridges
C3, C2 |
|||
(h)
SOP
construction (precast & in-situ cast in type) |
D2-01 |
|||
(i)
Road
construction |
TWSRW, TWSRE |
|||
(j)
Road works |
Jockey Club Rd, TWSRW |
|||
(k)
Base slab
construction |
NB109 ¡V bay 11~12 |
|||
(l)
Tree
Works |
All
works areas |
|||
(m)
Drainage
works |
On
Kui Street |
|||
ND/2019/06 |
N/A |
N/A |
N/A |
N/A |
ND/2019/07 |
(a)
Road
works |
Portion
1, 3, 4 |
- Construction Dust Impact - Noise Impact - Water Quality Impact (Construction Phase) - Waste Management (Construction Waste) - Landscape and Visual |
-
Regular
watering on exposed worksites and haul road. -
Stockpiling
area should be provided with covers and water spraying system. -
Only
well-maintained plant to be operated on-site. -
plant
known to emit noise strongly in one direction, where possible, be orientated
so that the noise is directed away from nearby NSRs. -
mobile
plant to be sited as far away from NSRs as possible practicable. -
All open
stockpiles of construction materials of more than 50m3 to be covered with
tarpaulin. -
Manholes
to be adequately covered and temporarily sealed so as to
prevent silt, construction materials or debris being washed into the drainage
system. -
All
vehicles and plant to be cleaned before leaving a construction site to ensure
no earth, mud, debris and the like is deposited by them on roads. -
Segregate
and store different types of waste in different containers, skip or
stockpiles to enhance reuse or recycling of materials and their proper
disposal. -
Sort out
demolition debris and excavated materials from demolition works to recover
reusable/recyclable portions. -
Provide
training to workers on appropriate waste management procedures, including
waste reduction, reuse and recycling. -
To adopt
other good site practice, such as arrangements for collection and effective
disposal to an appropriate facility, of all wastes generated at the site and
regular cleaning and maintenance programme for drainage. -
Chemical
wastes to be stored in appropriate containers and collected by a licensed
chemical waste Contractor. Chemical wastes (e.g. spent lubricant oil) should
be recycled at an appropriate facility as far as possible, while the chemical
waste that cannot be recycled should be disposed of at either the Chemical
Waste Treatment Centre, or another licensed facility, in accordance with the
Waste Disposal (Chemical Waste) (General) Regulation. -
Tree
Protection & Preservation ¡V Exiting trees to be retained within the
Project Site should be carefully protected during construction. In particular OVTs will be preserved according to ETWB
Technical Circular (Works) No. 29/2004. -
Tree
Transplantation ¡V Trees unavoidably affected by the Project works should be
transplanted where practical. Trees should be transplanted straight to their
final receptor site and not held in a temporary nursery as far as possible. -
Erect 2m
high dull green site boundary fence. -
Light
Control ¡V Construction day and night time lighting
should be controlled to minimize glare impact to adjacent VSRs during the
Construction phase. |
(b)
C&D
waste disposal |
Portion
2, 4 |
|||
(c)
Filling
works |
Portions
2 |
|||
(d)
Construction
of site haul road |
Portions
4 |
|||
(e)
Drainage
Works |
Portion 1, 2, 3, 4 |
|||
(f)
Sewerage
works |
Portion
3, 4 |
|||
(g)
Construction
of Noise Barrier |
Portion 4 |
|||
(h)
Waterworks |
Portion
1, 2, 3, 4 |
|||
|
|