Table 2.3 Summary Table for Major
Site Activities in the Reporting Month
Contract No. |
Site Activities (June
2025) |
ND/2019/01 |
(a)
Drainage
works, watermain works,
sheet piling and slope works
in Portion 1a (b)
Site
formation, watermain works, ELS construction, sewage
works, backfill and road works in
Portion 1c (c)
Site
formation, construction of subway, drainage
works, road
works, soil nail, slope work and tree felling in Portion 2 (d)
HAC soil treatment, watermain works,
drainage works and
sheet piles in Portion 3 (e)
Site
formation, watermain works and drainage works in Portion 5 (f)
Backfilling,
drainage works, watermain works, slope works, road works
and district cooling system in Portion 6a (g)
Operation
of HAC soil
treatment facility in Portion 6b (h)
Excavation, watermain works, sewage works, road works (UU)
and drainage works in Portion 7 (i)
Road works, RC structure works, drainage works, watermain
works, backfilling,
planting, metal works, slope works and E&M works in Portion 8a (j)
Ground Treatment, grouting,
watermain construction and
ELS construction in Portion 8b (k)
Sheet
piling, excavation, road works, drainage works, watermain works and district cooling system in
Portion 9b (l)
Drainage works in Portion
10b (m)
Drainage works in Portion
11b (n)
Stockpile of soil
in Portion 13 |
ND/2019/02 |
(a)
Backfilling (b)
Excavation (c)
Concreting (d)
Cut and Fill of Slope (e)
Sheet Piling (f)
Pipe
Jacking (g)
Pipe laying and bedding (h)
Grouting |
ND/2019/03 |
All
construction activities with significant environmental impact have been
substantially completed in
April 2024 and all outstanding works with defect rectification have also been
completed on 28 March 2025. |
ND/2019/04 |
(a)
Back Filling (b)
Excavation (c)
Grouting (d)
Road works (e)
Formwork and Scaffolding Erection (f)
Rebar Fixing and ELS (g)
Backfilling (h)
S960
Delivery (i)
Concreting |
ND/2019/05 |
(a)
South
Team -
BBI
Toilet ¡V ABWF and installation bio treatment plant are in progress. -
BBI
Toilet ¡V Dwarf Wall excavation to formation in progress. -
Lift LT01
¡V Lift installation is in progress. -
FS01a ¡V
Backfilling completed. Site being setup for sign gantry DS20 assembly. -
D400 ¡V
Road drainage construction and site formation are in progress for TTA-469. -
ADS21 PC1
¡V Site Clearance completed. Sheetpiling works in progress. -
ADS21 PC2
¡V Commencement of piling works is waiting for WSD¡¦s approval. -
E2-03 ¡V
Installation of grasscrete is in progress. -
E3-02 ¡V
Laying drain pipe to pier in progress. -
E4
Retaining Wall ¡V Stem wall is 100% completed. -
E4 Ramp
Utrough Bay 17~21 ¡V Footings are 100% completed. Stem walls along east side
are 80% completed. -
FW56 Bay
22~25 ¡V Footings are 100% completed. -
Noise
barrier NB109 A.
65 out of
81 noise barrier columns are installed. Installation of concrete profile
barrier is completed from Bay 5~19 along northbound. B.
Bay 1~4
Backfilling for SRT. -
Noise
barrier NB70 A.
Bay 1 to
6 ¡V Backfilling subbase layer in progress. -
Noise
barrier NB69 A.
Bay 1, 2a
¡V Footings are completed. Stem wall construction is in progress. -
Noise
barrier NB 29 Through Bay 1-23 A.
Footing
is 80% completed B.
Wall
(exclude parapet) is 70% completed. Parapet section will cast after
backfilling to formation. -
Noise barrier NB 30 A.
Bay 1 to
Bay 9 blinding completed B.
RC from
bay 15,17 & 20 completed & bay 1 to 6 in progress. -
Noise barrier NB 77 A.
ELS works
for NB77 footing completed, pile cap in progress. -
Fabrication
of Sign Gantry ¡V 8 out of 20 Columns are completed. DS20 Mid Chord is
completed and scheduled to erection on 10 June 2025. -
Fabrication
of Noise Barrier ¡V Fabrication of NB27a and NB110 columns are completed. NB28
and remaining NB109 columns fabrication are in progress. (b)
North
Team -
Reinstatement
works & footpath in C4-02 (HD) completed. -
D2-01,
C1-03, B2-01 & B2-03 catch pit & manhole construction in progress. -
D1-01,
E2-01, C1-02 & C2-01 watermain works & pillar box for viaduct
completed. D1-04 in progress. -
Backfilling
of B2-02, B2-03, C1-01b & D2-01 in progress. -
JCR:
Construction of new central median & ducting works for traffic signal
& road light were completed of 100%. -
JCR &
Tong Hang Village J/O improvement works (FS 25): slope works 98 % completed. -
JCR &
Tong Hang Village J/O (near bus-stop) : Ducting works for traffic signal
& road light was in progress (98 % completed). -
JCR near
F63 ¡Vslope feature construction works completed. -
JCR
resurfacing in progress (c)
Bridges
and Structures -
LG launched back to C1-01,
and the dismantle of LG in progress. -
Installation of parapet
and central median for bridge E4, E3, E2, B2 in progress -
Installation of deck void
drainage at Bridge E4 in progress. -
Reinstate of lifting tower
NF83A in progress. -
Installation of movement
joint C1-04a and C2-04a completed. Total 8 of 20 MJ installation completed. -
Water proofing on bridge
deck in progress, bridge D1, E1, C4R, C3R, C2R, C4L, C3L, C2L completed. -
Asphalt paving on the deck
in progress, base course of bridge E1, D1, C4R, C3R, C2R, C4L, C3L completed. -
Wearing course pavement on
the deck in progress. -
Installation of railing
and noise barrier on bridge deck in progress. -
Construction of the 2nd
pour concrete of B1-01 diaphragm beam and remaining Bridge B1 deck in
progress. |
ND/2019/06 |
The construction phase was
completed and handed over to AFCD since 4 April 2022. |
ND/2019/07 |
(a)
Road works at Portion 1, 3 and 4 (b)
C&D waste disposal at Portion 2 and 4 (c)
Filling works at Portion 2 (d)
Construction of site haul road at Portion 4 (e)
Drainage works at Portion 1, 2, 3 and 4 (f)
Sewerage works at Portion 3 and 4 (g)
Construction
of noise barrier at Portion 4 (h)
Waterworks at Portion 1, 2, 3 and 4 |