Table II  Summary Table for EM&A Activities in the Reporting Month

EM&A Activities

Monitoring Station (s)

Works Contracts

ND/2019/01

ND/2019/02

ND/2019/03

ND/2019/04

ND/2019/05

ND/2019/06

ND/2019/07

1-hr Total Suspended Particulates (TSP) Monitoring

FLN-DMS1

N/A

N/A

2, 6, 12, 18, 24 and 30 Jun 25

2, 6, 12, 18, 24 and 30 Jun 25

N/A

N/A

N/A

FLN-DMS3

N/A

N/A

2, 6, 12, 18, 24 and 30 Jun 25

FLN-DMS5

5, 11, 17, 23 and 27 Jun 25

5, 11, 17, 23 and 27 Jun 25

N/A

KTN-DMS4(B)

5, 11, 17, 23 and 27 Jun 25

5, 11, 17, 23 and 27 Jun 25

N/A

24-hr TSP Monitoring

FLN-DMS1

N/A

N/A

5, 11, 17, 23 and 27 Jun 25

5, 11, 17, 23 and 27 Jun 25

N/A

N/A

N/A

FLN-DMS3

N/A

N/A

5, 11, 17, 23 and 27 Jun 25

FLN-DMS5A

5, 11, 17, 23 and 27 Jun 25

5, 11, 17, 23 and 27 Jun 25

N/A

KTN-DMS4(B)

5, 11, 17, 23 and 27 Jun 25

5, 11, 17, 23 and 27 Jun 25

N/A

Noise Monitoring

CP-FLN-NMS1

N/A

2, 12, 18, 24 and 30 Jun 25

N/A

CP-FLN-NMS2

N/A

2, 12, 18, 24 and 30 Jun 25

N/A

CP-KTN-NMS2

5, 11, 17 and 23 Jun 25

N/A

N/A

CP-KTN-NMS3

CP-KTN-NMS5

CP-KTN-NMS6

N/A

5, 11, 17 and 23 Jun 25

Ecological Survey

Monitoring of Measures to Minimise Disturbance to Water Birds on Ng Tung River, Sheung Yue River, and Long Valley

N/A

N/A

4, 6, 10, 12, 19, 20, 23 and 27 June 25

6, 12, 20 and 27 June 25

N/A

N/A

N/A

Monitoring of Measures to Minimise Impacts to Ma Tso Lung Stream and Siu Hang San Tsuen Stream

17 June 25

N/A*

17 June 25

17 June 25

N/A*

N/A*

N/A*

Monitoring of Measures to Minimise Impacts on Ecological Sensitive Habitats from Disturbance and Pollution

12 and 20

June 25

12 and 20

June 25

20 June 25

20 June 25

20 June 25

N/A*

N/A*

Egretry Monitoring

N/A

N/A

N/A

N/A

N/A

N/A

N/A

24-hr RSP (Ambient Arsenic) Monitoring for Land Contamination

5, 11, 17, 23 and 27 Jun 25

N/A

5, 11, 17, 23 and 27 Jun 25

N/A

N/A

N/A

N/A

Water Quality Monitoring

N/A

2, 4, 6, 9, 11, 13, 16, 18, 20, 23, 25, 27 and 30 Jun 25

N/A

2, 4, 6, 9, 11, 13, 16, 18, 20, 23, 25, 27 and 30 Jun 25

N/A

N/A

N/A

Landfill Gas Monitoring

18 June 25

N/A

N/A

N/A

N/A

N/A

N/A

Built Heritage Monitoring

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Environmental Site Inspection

3, 10, 19 and 24 Jun 25

4, 11, 18 and 25 Jun 25

NIL

5, 12, 17 and 26 Jun 25

2, 9, 19, 26 and 30 Jun 25

NIL

2, 9, 16, 26 and 30 Jun 25

 



 

 

Remarks:  

N/A – No relevant monitoring is required according to the updated EM&A Manual

N/A* – No relevant monitoring is required according to the Baseline Ecological Monitoring Plan (Table 3.1)

[1] Since the distance between monitoring station CP-KTN-NMS2 and site boundary of ND/2019/03 under EP-468/2013/A exceeds 300m, the monitoring station is not applicable to ND/2019/03

[2] Since the distance between monitoring station CP-KTN-NMS3 and site boundary of ND/2019/03 under EP-468/2013/A exceeds 300m, the monitoring station is not applicable to ND/2019/03

[3] Since the distance between monitoring station CP-KTN-NMS1 and site boundary of ND/2019/02 under EP-469/2013 exceeds 300m, the monitoring station is not applicable to ND/2019/02

[4] Since the distance between monitoring station FLN-DMS1 and site boundary of ND/2019/05 under EP-473/2013/A exceeds500m, the monitoring station is not applicable to ND/2019/05

[5] Since the distance between monitoring station FLN-DMS3 and site boundary of ND/2019/03 and ND/2019/04 under EP-473/2013/A exceeds 500m, the monitoring station is not applicable to ND/2019/03 and ND/2019/04

[6] Since the distance between monitoring station FLN-DMS5 and site boundary of ND/2019/05 under EP-473/2013/A exceeds 500m, the monitoring station is not applicable to ND/2019/05

[7] Since the distance between monitoring station CP-FLN-NMS2 and site boundary of ND/2019/03 and ND/2019/04 under EP-473/2013/A exceeds 300m, the monitoring station is not applicable to ND/2019/03 and ND/2019/04

[8] Since the distance between monitoring station CP-FLN-NMS1 and site boundary of ND/2019/03 under EP-473/2013/A exceeds 300m, the monitoring station is not applicable to ND/2019/03