Table 10.2       Observations and Recommendations during Site Audits

Parameters

Date

Observations and Recommendations

Follow-up

Contract No.: ND/2019/01

 

Water Quality

09/09/2025

Cut-off drainage at Pak Shek Au should be provided to prevent runoff going through site surface.

Improvement/Rectification was observed during follow-up audit session on 17 September 2025.

Contract No.: ND/2019/02

Water Quality

27/08/2025

Sand bag bund should be enhanced along the boundary of works at CH1680.

Item was remarked as 250903-R01. Follow-up action is needed to be reviewed.

03/09/2025

Item was remarked as 250910-R01. Follow-up action is needed to be reviewed.

10/09/2025

Improvement/Rectification was observed during follow-up audit session on 17 September 2025.

27/08/2025

Exposed slope next to Sheung Yue River should be covered and maintained properly.

Item was remarked as 250903-R02. Follow-up action is needed to be reviewed.

03/09/2025

Item was remarked as 250910-R02. Follow-up action is needed to be reviewed.

10/09/2025

Item was remarked as 250917-R02. Follow-up action is needed to be reviewed.

17/09/2025

Item was remarked as 250923-R01. Follow-up action is needed to be reviewed.

23/09/2025

Improvement/Rectification was observed during follow-up audit session on 30 September 2025.

03/09/2025

Improper temporary drainage management causing muddy water direct discharge was observed from the works area CH1680. Contractor was reminded to rectify immediately.

Improvement/Rectification was observed during follow-up audit session on 10 September 2025.

10/09/2025

Used bentonite slurries should be collected and stored properly.

Item was remarked as 250917-R04. Follow-up action is needed to be reviewed.

17/09/2025

Item was remarked as 250923-R03. Follow-up action is needed to be reviewed.

23/09/2025

Item was remarked as 250930-R03. Follow-up action is needed to be reviewed.

30/09/2025

Follow-up action is needed to be reported in the following month.

Air Quality

17/09/2025

Stockpile of dusty material near VC should be covered by impervious sheeting properly.

Improvement/Rectification was observed during follow-up audit session on 23 September 2025.

Ecology

27/08/2025

Silt curtain should be maintained properly and regularly.

Item was remarked as 250903-R03. Follow-up action is needed to be reviewed.

03/09/2025

Item was remarked as 250910-R03. Follow-up action is needed to be reviewed.

10/09/2025

Item was remarked as 250917-R03. Follow-up action is needed to be reviewed.

17/09/2025

Item was remarked as 250923-R02. Follow-up action is needed to be reviewed.

23/09/2025

Item was remarked as 250930-R02. Follow-up action is needed to be reviewed.

30/09/2025

Follow-up action is needed to be reported in the following month.

Waste/Chemical Management

30/09/2025

Drip tray for chemical/fuel containers at CH1680 should be provided.

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/04

Water Quality

28/08/2025

Sand bag bunds should be supplemented to avoid surface runoff entering Ng Tung River.

Item was remarked as 250904-R01. Follow-up action is needed to be reviewed.

04/09/2025

Item was remarked as 250911-R01. Follow-up action is needed to be reviewed.

11/09/2025

Improvement/Rectification was observed during follow-up audit session on 18 September 2025.

Ecology

28/08/2025

2m high dull green barrier along the 10m buffer zone should be erected and maintained properly.

Item was remarked as 250904-R02. Follow-up action is needed to be reviewed.

04/09/2025

Improvement/Rectification was observed during follow-up audit session on 11 September 2025.

Contract No.: ND/2019/05

Waste/Chemical Management

09/09/2025

Drip tray for the chemical/fuel containers at C1-03 should be provided.

Improvement/Rectification was observed during follow-up audit session on 16 September 2025.

Air Quality

16/09/2025

Faded NRMM label should be replaced.

Improvement/Rectification was observed during follow-up audit session on 22 September 2025.

16/09/2025

Stockpile of dusty material should be covered by impervious sheets properly or remove.

Improvement/Rectification was observed during follow-up audit session on 22 September 2025.

16/09/2025

NRMM label on regulated machine should be displayed properly.

Improvement/Rectification was observed during follow-up audit session on 22 September 2025.

22/09/2025

Stockpile of dusty material should be covered by impervious sheets properly.

Improvement/Rectification was observed during follow-up audit session on 29 September 2025.

Contract No.: ND/2019/07

 

--

--

--

--